Bathroom Remodeling
New Basement Bathroom
This next set of pictures was the creation of a basement bathroom where there was not one before. This included some demolition of existing walls, installing sub grade plumbing, building walls installation of all plumbing fixtures, tile on floor. 12 Stones inc did the entire job with the exception of the painting that was done by the homeowner.
Bathroom Update
Next is a master bath that was simply updated. All faucets and towel bars were replaced. A large single miror was removed and replaced with two picture frame type mirrors. The shower enclosure was repalced. The carpet on the floor was replace with tile. The entire bathroom was stripped of wallpaper and painted. The entire project was done by 12 Stones Inc. with no customer labor.
